EXPERIENCE

SHEIKH ABDEL QURNA SITE IMPROVEMENT AND JOB CREATION

Capacity: Engineering and Architectural

DESCRIPTION

Investigations accompanying site improvements often include investigations of subsurface anomalies prior to excavating This includes location of underground utilities such as electric cable but also archaeological material to avoid or salvage prior to construction. As part of the improved access to Theban Tomb 110 and preceding excavations, Ground Penetrating Radar (GPR) was performed to discover subsurface irregularities so that plans could be developed and implemented with the information provided by the survey. The investigation located subsurface electrical cable to avoid as well as other information allowing the access to TT110 to be completed with no delays.

PROJECT VISUALS

Year: 2017